On site now

The sites we are working on.

Right now we are working in parallel on a water park, apartments in a seaside resort, a 700-apartment development, a hotel, clinics and stores.

  1. In progress · Sinaia, Prahova

    Aqua Park Sinaia

    A water park complex that seems to float above the forest at the foot of the Bucegi Mountains: pools, water slides, spa and restaurants. We bring it light, power and safety.

    • Electrical installations
    • Fire detection and alarm
    • Access control
    ~2 ha
    of land, next to the Sinaia Gondola
    3
    pools, including a semi-Olympic one and one with slides
    7
    saunas, plus spa, jacuzzi and massage
    10+
    million euros, total investment in the complex
  2. In progress · Bucharest

    International furniture retailer, Liberty

    The urban format of an international furniture retailer: compact, inspiring, with products to take home on the spot. We bring the light and power, from the main distribution board to the last display spotlight.

    • Electrical installations
  3. In progress · Bucharest, Splaiul Independenței

    Hotel ibis Politehnica

    Installation alterations and maintenance in a hotel that never closes. We work with watchmaker precision, without guests noticing a thing.

    • Installation alterations
    • Maintenance
    158
    rooms
    4
    event rooms, for up to 150 people
    24/7
    open around the clock, never closed for the works
  4. In progress · Olimp, Constanța

    Novum by the Sea Residences

    A holiday town, powered up.

    New apartments at the heart of the Novum by the Sea resort, with a medical spa, pools, a beach and restaurants a few steps away. We deliver the electrical installations and fire detection.

    • Electrical installations
    • Fire detection
    160
    apartments in the already-open resort
    15+
    million euros invested in the resort
    3
    million euros in the spa and balneotherapy centre
    2
    pools, outdoor and indoor, plus a beach
  5. In progress · Bucharest, 56 Timișoara Blvd.

    Novum 56

    A whole neighbourhood in the west of the capital, built in successive phases. Here we do everything: power and low-current systems, from distribution boards and lighting to fire and carbon-monoxide detection in the car park.

    • Full scope
    • Power and low-current systems
    704
    apartments, across several buildings
    867
    parking spaces
    90
    million euros, investment announced by the developer
    4
    phases: the first delivered, three under way

Also on site now

And the list goes on.

Housing, healthcare, retail: the same rigour, however different the project.

The Danube at Orșova, between wooded hills

In progress · Orșova

Residential block on the Danube

The electrical installations of an apartment block, from the main distribution board to the last socket in the last apartment.

Electrical installations

Dental surgery with a dental chair and an operating light

In progress · Bucharest

Two dental clinics

Dedicated circuits for every piece of equipment, residual-current protection and lighting designed for precision.

Electrical installations and low-current systems

Store floor plan with lighting circuits and checkouts, drawn by ZAG Electric

In progress · Bucharest

Small-format stores of the international furniture retailer

Lighting that shows off every room set, and checkouts that can never go down.

Electrical installations

“Your project, our challenge!”

Tell us what you are building. We will get back to you with a quote, or with the right questions.

office@zagelectric.ro